$600M Gold Extraction Plant to Be Built in Akmola Region
Summary
A new gold extraction plant worth $600 million is planned for construction in Kazakhstan's Akmola Region.
Prepared by the newsroom with AI assistance; the original link is always provided
A major gold extraction plant valued at $600 million is set to be constructed in the Akmola Region of Kazakhstan.
The investment project includes the construction of key auxiliary infrastructure. It involves the development of power and water supply facilities, a tailings management system, and transport logistics networks required to support the facility's operations.
The initiative will expand the region's mining and mineral processing capacity.
Source: Kapital.kz
Read the original →Latest news
Bank CenterCredit Repurchases Shares for 18.2B Tenge on KASE
Bank CenterCredit JSC has repurchased 4.1 million of its common shares on the Kazakhstan Stock Exchange for 18.2 billion tenge.
Source: KASE
Home Credit Bank Bonds Added to KASE T+ List
Starting October 8, Home Credit Bank bonds (KZQ000001213, HCBNe1) will be included in the KASE T+ List.
Source: KASE
KASE Publishes Member Activity Rankings for September 2026
Kazakhstan Stock Exchange has released its exchange member activity rankings for September 2026 on its official website.
Source: KASE
KASE Index rises 0.25% to 7,862.81 points
On October 7, the KASE Index climbed by 0.25% to settle at 7,862.81 points.
Source: KASE