Major Plant Under Construction in Kazakhstan Could Generate 1.4T Tenge

Summary
A large industrial plant under construction in Kazakhstan could generate 1.4 trillion tenge for the state budget.
Prepared by the newsroom with AI assistance; the original link is always provided
A large-scale industrial plant currently under construction in Kazakhstan is projected to bring 1.4 trillion tenge into the state budget.
The future facility will focus on processing mineral resources. The final products of the plant will be copper and molybdenum concentrates.
Source: Digital Business KZ
Read the original →Latest news
Bank CenterCredit Repurchases Shares for 18.2B Tenge on KASE
Bank CenterCredit JSC has repurchased 4.1 million of its common shares on the Kazakhstan Stock Exchange for 18.2 billion tenge.
Source: KASE
Home Credit Bank Bonds Added to KASE T+ List
Starting October 8, Home Credit Bank bonds (KZQ000001213, HCBNe1) will be included in the KASE T+ List.
Source: KASE
KASE Publishes Member Activity Rankings for September 2026
Kazakhstan Stock Exchange has released its exchange member activity rankings for September 2026 on its official website.
Source: KASE
KASE Index rises 0.25% to 7,862.81 points
On October 7, the KASE Index climbed by 0.25% to settle at 7,862.81 points.
Source: KASE