Power Plant Worth 881 Billion Tenge to Be Built in Kurchatov
Summary
A new power plant valued at 881 billion tenge utilizing clean coal technology will be constructed in Kurchatov.
Prepared by the newsroom with AI assistance; the original link is always provided
A new power generation facility is set to be constructed in the city of Kurchatov, Kazakhstan. The total investment for the project is estimated at 881 billion tenge.
The plant will be equipped with modern steam-power machinery. According to project details, the facility will utilize "clean coal" technologies to optimize energy generation and support infrastructure development.
Source: Kapital.kz
Read the original →Latest news
Bank CenterCredit Repurchases Shares for 18.2B Tenge on KASE
Bank CenterCredit JSC has repurchased 4.1 million of its common shares on the Kazakhstan Stock Exchange for 18.2 billion tenge.
Source: KASE
Home Credit Bank Bonds Added to KASE T+ List
Starting October 8, Home Credit Bank bonds (KZQ000001213, HCBNe1) will be included in the KASE T+ List.
Source: KASE
KASE Publishes Member Activity Rankings for September 2026
Kazakhstan Stock Exchange has released its exchange member activity rankings for September 2026 on its official website.
Source: KASE
KASE Index rises 0.25% to 7,862.81 points
On October 7, the KASE Index climbed by 0.25% to settle at 7,862.81 points.
Source: KASE