Turkish Investor Builds Gold Processing Plant in Kazakhstan on 23-Tonne Deposit

Summary
A gold processing plant is being built in Kazakhstan with Turkish participation on a deposit containing 23 tonnes of gold reserves.
Prepared by the newsroom with AI assistance; the original link is always provided
A Turkish investor has launched the construction of a new gold processing plant in Kazakhstan. The production facility is being established on a deposit with estimated gold reserves of 23 tonnes.
The industrial project aims to expand extraction and processing capabilities in the country's mining and metallurgical sector through international investment.
According to the development timeline, construction of the gold extraction plant is scheduled to be completed by 2028.
Source: Digital Business KZ
Read the original →Latest news
Bank CenterCredit Repurchases Shares for 18.2B Tenge on KASE
Bank CenterCredit JSC has repurchased 4.1 million of its common shares on the Kazakhstan Stock Exchange for 18.2 billion tenge.
Source: KASE
Home Credit Bank Bonds Added to KASE T+ List
Starting October 8, Home Credit Bank bonds (KZQ000001213, HCBNe1) will be included in the KASE T+ List.
Source: KASE
KASE Publishes Member Activity Rankings for September 2026
Kazakhstan Stock Exchange has released its exchange member activity rankings for September 2026 on its official website.
Source: KASE
KASE Index rises 0.25% to 7,862.81 points
On October 7, the KASE Index climbed by 0.25% to settle at 7,862.81 points.
Source: KASE