Ushtagan Refinery to Build Gold Processing Plant and Water Pipeline
Summary
Ushtagan Refinery plans to launch the construction of a gold processing plant and a dedicated water pipeline in November 2026.
Prepared by the newsroom with AI assistance; the original link is always provided
Ushtagan Refinery is planning to carry out a new industrial development project comprising the construction of a gold processing plant and an accompanying water pipeline.
According to the project schedule, construction works are slated to begin in November 2026. The new facility will expand precious metals processing capacity and provide the required industrial infrastructure.
Source: Kapital.kz
Read the original →Latest news
Bank CenterCredit Repurchases Shares for 18.2B Tenge on KASE
Bank CenterCredit JSC has repurchased 4.1 million of its common shares on the Kazakhstan Stock Exchange for 18.2 billion tenge.
Source: KASE
Home Credit Bank Bonds Added to KASE T+ List
Starting October 8, Home Credit Bank bonds (KZQ000001213, HCBNe1) will be included in the KASE T+ List.
Source: KASE
KASE Publishes Member Activity Rankings for September 2026
Kazakhstan Stock Exchange has released its exchange member activity rankings for September 2026 on its official website.
Source: KASE
KASE Index rises 0.25% to 7,862.81 points
On October 7, the KASE Index climbed by 0.25% to settle at 7,862.81 points.
Source: KASE